(原)中山大学-卡内基梅隆大学联合工程学院2019年5-6月ESI论文收录

序号 文献类型 第一完成单位/合作单位 ESI学科类别 题录
1 Highly Cited paper 第一完成单位 Engineering Simultaneous allocation of electric vehicles' parking lots and distributed renewable resources in smart power distribution networks. Sustain Cities Soc 2017, 28:332-342.
2 Highly Cited paper 第一完成单位 Engineering ARIMA-based decoupled time series forecasting of electric vehicle charging demand for stochastic power system operation. Electr Pow Syst Res 2016, 140:378-390.
3 Highly Cited paper 第一完成单位 Engineering Distributed Optimal Resource Management Based on the Consensus Algorithm in a Microgrid. Ieee T Ind Electron 2015, 62:2584-2592.
4 Highly Cited paper 第一完成单位 Engineering Cooperative Control of Distributed Energy Storage Systems in a Microgrid. Ieee T Smart Grid 2015, 6:238-248.
5 Highly Cited paper 合作单位 Engineering A simultaneous approach for optimal allocation of renewable energy sources and electric vehicle charging stations in smart grids based on improved GAPSO algorithm. Sustain Cities Soc 2017, 32:627-637.
6 Highly Cited paper 合作单位 Engineering A novel multi-time-scale modeling for electric power demand forecasting: From short-term to medium-term horizon. Electr Pow Syst Res 2017, 142:58-73.